Haldeman Creek Projects

Bathymetric Survey and Data Review

Humiston and Moore Engineers was retained to provide a Bathymetric Survey of the Haldeman Creek existing conditions. The survey data was used to compare the 2006 /2007 post dredge information with the current conditions. The information was used for discussion to move forward with permitting if dredging is required. As of 5-30-2019 all the field work, data collection and analysis was completed and was presented to the Advisory Committee on October 3, 2019. Dredging permit application has been filed with the Army Corps of Engineers and is pending Review.